Malaysia 30 m² SAC Electronics Cleanroom

Completed in Malaysia in 2023, this 30 m² SAC cleanroom targets ISO 8 for electronic component operations.

Delivered in Malaysia in 2023, this 30 m² SAC project served electronic component operations that required an ISO 8 clean environment. The small area called for a practical site-assembled layout that could fit the client's operating space. The modular cleanroom package included walls and cleanroom ceiling panels, supported by HVAC and filtration, lighting, electrical services, automation, and monitoring. On-site cleanroom installation was followed by commissioning and validation within the project scope. By treating the enclosure and environmental services as a coordinated package, the project addressed the interfaces that are easy to overlook in a compact room. The recorded lead time was one month. This case provides an example of SAC delivery for electronics manufacturing where a targeted controlled area is needed, rather than a large cleanroom facility. The public summary intentionally leaves out the client's name, equipment arrangement, and any process performance data not documented in the source material.

Malaysia 30 m² SAC Electronics Cleanroom
30 m² Kawasan terkawal
1 month Penghantaran
ISO 8 Kelas bilik bersih
01
CABARAN

Menangani Kekangan Projek Sebenar

Provide approximately 30 m² of ISO 8 clean space for electronic component operations with a compact site-assembled layout.

02
PENYELESAIAN

Direka untuk Proses

A compact site-assembled SAC modular cleanroom provided 30 m² of ISO 8 space for electronic component operations in Malaysia.

SKOP PENGHANTARAN

Pakej Bilik Bersih Bersepadu

Pakej projek diselaraskan sebagai sistem lengkap supaya antara muka seni bina, mekanikal dan kawalan kekal sejajar dari reka bentuk hingga kelayakan.

  • 01Site-assembled modular walls and ceiling for a 30 m² electronics cleanroom
  • 02HVAC and filtration serving the ISO 8 clean space
  • 03Lighting, electrical, automation and monitoring systems
  • 04On-site assembly, commissioning and validation
MULAKAN PROJEK ANDA

Merancang Bilik Bersih Serupa?

Kongsi keperluan proses, klasifikasi dan jadual anda. Pasukan kami akan mengesyorkan pendekatan PAC atau SAC yang sesuai.